Day 3 I was at work, so I didn't get to watch as the day progressed.  I know that the hole in the floor was filled in.

Day 4:

  • The drywall sections on either side of the family room opening were put into place.
  • Proper venting for the over the range microwave was finished.
  • Insulation was put in the kitchen walls.
  • Ceiling drywall was hung.
  • Some kitchen drywall hung.
Unfortunately the guys had to spend a long time at Home Depot getting supplies.  The store just doesn't have enough people to help you when you need it.  